ResourceNOAA ARRA USVI Watershed Stabilization Project. East End Bay, St. Croix erosion repairs, trail construction and drainage improvements
The East End Bay, St. Croix, component of the overall USVI Watershed Stabilization Project had two main objectives: (1) repair existing erosion damage and reduce future erosion by improving runoff drainage conditions along pre-existing foot trails at East...