FeedbackAboutHelpLogin
Department of Commerce National Oceanic and Atmospheric Administration Department of Commerce
National Oceanic and Atmospheric Administration
CoRIS Site Home Search BrowseSearch Tips
CoRIS Banner

.

Hurricane Impact Assessment on Implemented BMP Projects in Guanica and Culebra Watersheds, Puerto Rico


Description:

Author(s):
Horsley Witten Group, and Protectores de Cuencas,
Title:
Hurricane Impact Assessment on Implemented BMP Projects in Guanica and Culebra Watersheds, Puerto Rico
Publication Date:
2018
Institution:
US DOC; NOAA; NOS; Office for Coastal Management Horsley Witten Group Protectores de Cuencas
Type Period Note:
Tech Report
Abstract:
"The purpose of this report is to summarize damages observed in November at NOAA- funded restoration sites in Gunica and Culebra caused by Hurricanes Irma and Maria in September of 2017. Eight project sites were evaluated in Culebra, specifically in Punta del Viento, Zon, Punta Soldado, Aeropuerto, Fulladosa, Townsite, Puerto Manglar, and Tamarindo with a two-phase project. Several sites were evaluated in the upper Guanica Bay watershed as well. Projects completed in these areas included the stabilization of a dirt road network, stormwater practices, among others. All of these projects have utilized green infrastructure practices to intercept stormwater runoff and utilize plants, soils, and natural processes to filter and reduce runoff pollution. This report includes a brief summary of pre and post-hurricane conditions (Section 3), as well as estimated repair costs."
Electronic Access:
Notes:
FY2019; CRCP Project ID: 397; Project Title: Guanica Watershed Coordination; Principal Investigator: Rob Ferguson

Back to Top
/search/rest/document?f=html&id=%7B2B96FF5A-FE46-4239-BEC5-26A98474F4CD%7D
This Geoportal was built using the Geoportal Server. Please read the Disclaimer and Privacy or Contact Us.